przejeście pożarowe

How to Design and Maintain a Fire-Stopping Penetration Seal That Complies with Polish Regulations

A properly executed fire-stopping penetration seal is one of the key elements of fire separation – and one of the most frequently neglected. A solid fire separation wall loses its whole purpose if the opening through which cables or pipes run is not properly sealed. A service penetration without a certified system is a gap through which fire and smoke can pass as freely as through an unprotected partition. The lack of a proper seal deprives the partition of its required EI class and in practice significantly reduces the fire resistance of the entire barrier. This is not theory: a large share of the non-conformities EHS Consulting finds during fire safety audits concerns exactly these points, which at first glance look like a minor installation detail.

This article is a practical guide: from identifying the right type of seal, through choosing a certified product and the key installation steps, to labelling, costs and periodic inspections. It is aimed at investors, maintenance managers, building services designers and people responsible for fire safety in industrial and office buildings.

Types of service penetrations: pipes, cables and ventilation ducts

The type of service passing through the partition determines the choice of protection. Before you reach for a product catalogue, you need to know what hazard you are dealing with – separately for each service.

Pipe penetrations: combustible pipes vs metal pipes

A plastic pipe (PVC, PP, PE) melts in a fire and leaves an open hole in the partition. That is why intumescent products are used with combustible pipes: collars, wraps or sleeves that expand under heat and close the gap that forms. A metal pipe does not melt, but it conducts heat and can carry the fire to the other side of the partition. Here, the key is to seal the gap and limit heat transfer using a fire-resistant sealant or mortar. Pipes with combustible insulation, such as rubber or foam, require additional protective measures.

Fire-stopping cable penetrations: single cables, cable bundles and busbar trunking

A cable penetration must take into account the total number of cables, the way they are laid and the cross-section of the opening, not just the diameter of a single cable. For large openings, sealant alone is not enough: fire-protection boards or modular systems are needed. If the cable route is to be extended in the future, the system must allow for this right from the design stage. Adding cables later beyond the scope of the documentation invalidates the fire classification of the penetration.

Ventilation ducts and mixed penetrations

A sheet-metal duct first and foremost requires a fire damper or fire-resistant enclosure. Sealing the gap around the duct alone will not block smoke and hot gases travelling through its interior. Mixed penetrations, where combustible pipes, cables and ducts pass through a single opening at the same time, require a system tested for exactly that configuration. You cannot combine separate solutions and assume that the whole meets the required fire resistance class.

Fire-stopping penetration seals – legal requirements and EI fire resistance classes

Understanding the principle of class equivalence is the basis of every selection. Without it, even the most expensive product may not meet the applicable regulations.

The principle of class equivalence and exceptions in the regulations

A fire-stopping penetration seal must have an EI class at least equal to the class of the partition (§ 234(1) of the Polish regulation on technical conditions for buildings). Through an EI 60 wall you use an EI 60 system, through an REI 120 floor – an EI 120 system. The penetration does not need an R class, because it has no load-bearing function. The regulations provide an exception for single water supply, sewage and heating pipes leading to sanitary and hygiene rooms (§ 234(2)). It is also worth remembering the limit on the area of openings in a fire separation element: up to 15% of the wall area and 0.5% of the floor area (§ 232(2); Journal of Laws 2022, item 1225).

Note on the legal status: the Regulation of the Minister of Infrastructure of 12 April 2002 on the technical conditions to be met by buildings and their location ceased to have effect on 20 September 2026, and the new regulation has not yet been issued. Under Article 102a of the Polish Construction Law (added by the Act of 31 July 2026, Journal of Laws item 1161), for 18 months from that date designs may be prepared in accordance with the previous provisions – and it is those provisions that the paragraphs cited here refer to.

PN-EN 13501-2 and the technical conditions: how to apply these rules in practice

Fire resistance is classified according to PN-EN 13501-2, and the product used must be classified for the specific arrangement: type of partition, type of service, diameter, insulation, thickness of the wall or floor. The word “fire-resistant” on the packaging is no substitute for a technical document. Ordinary expanding foam, sanitary silicone or plaster are not a fire-stopping system and must not be used as substitutes for certified solutions.

From our experience

Unfortunately, we often come across such situations during our site visits. Sometimes fire safety specialists or inspectors who would have pointed out such a non-conformity in time are not involved in the building’s renovation. Years later, the “temporary” solution is forgotten – until the first fire. After such an incident, the insurer often asks about the certification of the solutions used, and if there is none, it may refuse to pay out.

How to choose a certified fire-stopping product

The market offers a wide range of products, but a product certificate does not mean that every way of using it is certified. Before you place an order, ask the supplier for the right documents.

Intumescent wraps, mortars and modules: what to use when

Intumescent wraps and collars are used with combustible pipes. Fire-resistant mortars and acrylic sealants work well for cable penetrations and smaller openings. Large multi-cable openings require board-and-mortar systems or modular systems (a steel frame with multi-hole blocks). Mineral wool serves as a filling element, but is never a seal on its own. The indicative range of classes available on the market is EI 30 to EI 240, depending on the configuration and the manufacturer.

What the certification documents should include: ETA, KOT and the declaration of performance

Before buying, ask the supplier for the following documents:

  • the number of the European Technical Assessment (ETA) or the Polish National Technical Assessment (KOT – Krajowa Ocena Techniczna) – you can verify an ETA in the EOTA database, and a KOT with the Building Research Institute (ITB) or CNBOP-PIB (the Polish Scientific and Research Centre for Fire Protection),
  • a current fire classification report according to PN-EN 13501-2 (tests in accordance with EN 1366-3) for the planned configuration,
  • the declaration of performance (DoP, Polish: DWU),
  • the manufacturer’s installation instructions,
  • confirmation that the product is intended for the specific partition and type of service.

An ETA or KOT confirms the performance of a specific solution in a specific configuration, not of every possible way of using the product. If your installation departs from the scope described in the document, the fire classification no longer applies. It is a simple rule that protects you from costly rework during acceptance by the State Fire Service (PSP – Państwowa Straż Pożarna).

Installing a fire-stopping penetration seal: preparation, execution and labelling

A correctly selected system can still be installed badly. Below you will find the key steps and the most common mistakes that come to light at acceptance.

Preparing the opening and selecting the system

First, determine the EI class of the partition and its type: solid wall, lightweight wall or floor. Make an inventory of all services passing through the opening, their diameters, materials and insulation. Select a system that is classified for exactly this configuration. Before installation, clean the opening of loose concrete, plaster, old foam and grease: the edges must be clean, and the dimensions of the opening must match those specified in the system, not arbitrary ones.

Making the seal: order of layers and critical points

With combustible pipes, first fit the intumescent elements in the position and number specified by the manufacturer. Then fill the opening with wool or mortar to the required depth. Finally, apply a top layer of sealant with no cracks or gaps. With cable bundles, the sealant must fill the spaces between individual cables, not just the perimeter of the opening. The most common mistakes are insufficient seal depth, replacing system components with random materials and adding cables beyond the scope allowed by the documentation.

Labelling and acceptance documentation

Every penetration must have a durable label showing: the penetration number, the system used, the EI class, the date of installation and the installer’s details. The acceptance documentation, in line with the system manufacturers’ recommendations and the requirements arising from the regulations on acceptance of construction works, includes photos before, during and after installation, the product data sheet, the installation instructions, the declaration of performance and an entry in the penetration register with the location and type of service. Without this documentation, you will not be able to prove during a State Fire Service inspection that the seal meets the required fire resistance class.

Cost of a fire-stopping penetration seal with installation: how much to budget

Below you will find indicative net price ranges per unit including materials and installation, based on market quotes collected by EHS Consulting in 2025 and 2026. They are a starting point for discussion with a contractor, not a guaranteed quote – costs change with material prices and labour rates.

Type of penetrationIndicative net cost (PLN/unit)
Plastic pipe, intumescent collar, small diameter200–600 PLN
Plastic pipe, class EI 120700–1,200 PLN
Small cable penetration EI 60350–550 PLN
Cable penetration with sealant and wool, opening up to approx. 300×300 mm300–750 PLN
Large cable penetration EI 120–EI 2401,000–3,000 PLN
Modular system (steel frame, multi-hole blocks)600–2,000 PLN
Ventilation or multi-service penetration1,000–3,000 PLN

With a large number of simple points, contractors apply a package rate: roughly 80–250 PLN net per point. Labour usually costs 150–600 PLN per penetration, and materials range from 50 PLN to over 1,000 PLN for large systems.

What affects the final quote

The cost rises with the required EI class, the thickness and type of partition, and difficult access to the installation point. Work in cable shafts, above suspended ceilings or in congested services is more expensive than in open space. It is worth adding 200–500 PLN to the budget for acceptance documentation if it is not included in the unit price.

Inspections, inspection checklist and staff training

A penetration made in line with the documentation may over time cease to comply with it. Cracked sealant, added cables or a missing label are irregularities that come to light during inspections and generate repair costs many times higher than regular checks.

Service penetration inspection checklist

During each inspection, check the following points:

  • continuity of the seal: no cracks, gaps or voids,
  • presence and legibility of the label (number, system, EI class, date),
  • completeness of entries in the penetration register,
  • no cables or pipes added beyond the scope allowed by the system,
  • condition of intumescent collars, sleeves and wraps,
  • no mechanical damage to the seal or the area around the opening,
  • correct fixing of the services on both sides of the partition.

Inspection frequency and staff training

We recommend that service penetrations be formally inspected and the results documented at least once a year. In addition, an inspection is necessary every time after work near the penetration, after a change to the cable route or after any interference with the seal. Maintenance staff and contractors should complete training covering how to recognise types of fire-stopping seals, the rules for permitted interference and the obligation to update the penetration register after every change.

When to commission an external fire safety audit

At a chemical plant with a network of several hundred fire-stopping penetrations through fire zones, an audit carried out by EHS Consulting showed that over 30% of the penetrations had no up-to-date documentation or had seals made outside the scope of the system. The result was full compliance of the facility ahead of a State Fire Service inspection, as well as a complete penetration register with a schedule of periodic inspections and a clear division of responsibilities.

In this area, EHS Consulting offers: an audit of the existing condition with a photographic inventory of penetrations, implementation or updating of the register, training for technical staff and support in selecting systems for new investments. Buildings that have never had a formal audit of their fire-stopping seals often have an incomplete or outdated penetration register. It is worth checking this before an inspector does.

Summary: three questions worth asking yourself today

A fire-stopping penetration seal is not an installation detail, but a fully-fledged element of fire separation. It must be designed, installed and maintained with the same care as the entire partition. Before you close this page, answer three questions: does every penetration in your building have a certified system with ETA or KOT documentation; is it labelled, entered in the register, and when was it last inspected; and has anyone added a cable or pipe there since then.

If even one answer is unclear, it is worth acting before an inspection takes place. Book an audit tailored to your sector and the scale of your facility: our team of regional specialists serves both small office buildings and extensive industrial plants throughout Poland.

Legal basis: Regulation of the Minister of Infrastructure of 12 April 2002 on the technical conditions to be met by buildings and their location (Journal of Laws 2022, item 1225), applied transitionally under Article 102a of the Polish Construction Law; PN-EN 13501-2. Legal status: November 2026.

Zobacz także