Work Organization Project (POR)

Commission us to prepare a Work Organization Project for your construction site in Poland – reliably, in line with regulations and on time.

Work Organization Project POR

Why choose us?

  • At EHS Consulting, the POR is prepared by specialists with years of experience in occupational safety and construction supervision.
  • We have hands-on knowledge from many projects – we know how to plan the safe execution of works.
  • We prepare the document in line with applicable regulations and Polish standards.
  • We create every plan individually, tailoring it to the project, site conditions and the investor’s requirements.
Document

What is a POR?

What is a Work Organization Project?

A POR is a document defining how construction works will be carried out – site organisation, technologies, work schedule, OHS rules and resource management. It is prepared by the contractor together with the OHS service, in connection with the BiOZ plan.

When is it required?

A POR is mandatory for particularly dangerous works – wherever a BiOZ plan applies. It is also required by investors in the energy, industrial and infrastructure sectors as a contractual standard.

Roles

Who prepares and signs a POR?

Who prepares it

The contractor – usually the site manager, working with the OHS service and the designer.

Who agrees and signs

The investor, supervisory inspector, OHS service and project manager.

When to outsource

When in-house resources are lacking or the project is complex – a specialised OHS firm ensures compliance with regulations and standards.

Relationship

POR and the BiOZ plan

BiOZ plan

A legally mandatory document for particularly dangerous works or large construction sites. It defines hazards and measures protecting workers’ health.

Learn more about the BiOZ plan

Work Organization Project

A planning and technical document prepared in connection with BiOZ. It defines how the works will be organised – technology, schedule, equipment, resources and OHS rules on site.

How does it work?

01. Contact

You describe the project – scope of works, sector and the investor’s requirements.

02. Analysis

We analyse the design documentation, site conditions and work technology.

03. Preparation

We prepare a full POR compliant with regulations and send it for approval by all parties.

04. Revision & handover

We incorporate the parties’ comments, deliver the final document and stay at your disposal.

What information does a Work Organization Project contain?

An example scope of the document:

  • basic project information
  • legal basis
  • description of the technologies used in construction and assembly
  • method of carrying out the works
  • health and safety rules
  • list of the main assembly equipment
  • warehouse management
  • demand for electricity and other utilities
  • measures limiting environmental impact
  • site development plan

Interested in OHS services in Poland? EHS Consulting is at your disposal!

Commission a Work Organization Project

Tell us about your project – we will prepare a POR compliant with regulations, on time and tailored to your construction site.

Frequently asked questions

The work organization project should be agreed upon and signed by the relevant parties (investor, supervisory inspector, OHS service, project manager).

The project includes, among others: an agreement with the investor for detailed documentation (site development or building construction/modernisation); the construction project; Polish standards and building regulations.

The cost of preparing a Work Organization Project starts from PLN 800 net (+23% VAT) and depends on the scope of the works and the scope of the document.

The price includes: development of the document according to agreed assumptions and after consultation with the client; corrections based on the client’s feedback; further consultation after the document is implemented.

Building law does not impose a universal obligation to prepare a POR for every project – but it is required for particularly dangerous works (wherever a BiOZ plan applies) and is often a contractual requirement set by the investor, especially in the energy, industrial and infrastructure sectors.

A BiOZ plan is a legally mandatory document focused on hazards to workers’ health and life. A POR is a planning and technical document defining how the works will be organised: technology, schedule, equipment, resources and site logistics. The two are closely linked and often prepared in parallel.

The timeline depends on the complexity of the project and the scope of the document. A POR is typically prepared within 5 to 14 working days of receiving complete design documentation. Express delivery is possible for urgent needs – contact us to discuss the details.

Yes. A POR should be updated whenever there are significant changes to the scope of works, technology, schedule or site conditions. An update requires re-agreement with the relevant parties. EHS Consulting also offers updates and supplements to already prepared projects.